|
max flow
I have re-run the model (a single reservoir and a single reach - using option one) and I get a depletion table (the program seems to be calculating the outflow hydrograph from the dam), however the results the program produces for the downstream routing do not add up. From the final hydrograph (and the max flood), I can tell that only the initial flow is used and is not recognizing any of the breach outflow. Is there a trigger that I can use to have the program use all of the reservoir outflow and not just the initial value that is used throughout the time of analysis?
|