HEC-RAS Merging reaches

I have two different reaches for the same river system. They were developed separately and one flows right into the next. This is not a junction problem. Is there a way to merge them into a single reach. I know how to re-station. I just need to turn RIVER REACH 1 & RIVER REACH 2 into a single system with just RIVER and REACH. I have geoRAS and could use that. I think I have a brute force method to do this, but I am looking for a more elegent / simple solution.

Thanks