View Single Post
  #2 (permalink)  
Old 04-02-2008, 12:02 PM
dawid_vancoller dawid_vancoller is offline
Registered User
 
Join Date: Feb 2007
Posts: 2
Have you tried using a levee?

If you put a levee on the highest point in the cross section between the two channels, no flow will occur in the remnant channel until the water level exceeds the elevation of the levee.
Reply With Quote