View Single Post
  #2 (permalink)  
Old 07-16-2008, 07:11 PM
Chris Maeder Chris Maeder is offline
Administrator
 
Join Date: Aug 2001
Location: Madison, WI
Posts: 797
If the reaches are part of a tributary network model, you will need to have a minimum of three reaches and a junction. (This is a HEC-RAS limitation.)

If these two reaches are independent (as it sounds in your posting), then you need to select the reach you want to export, and then export the HEC-RAS file. Therefore, you will have to export each reach separately.
__________________
Sincerely,

Chris E. Maeder, M.S., P.E.
Senior Technical Engineer
chris.maeder@bossintl.com
Reply With Quote