View Single Post
  #6 (permalink)  
Old 03-23-2009, 01:31 AM
ahsansattar ahsansattar is offline
Registered User
 
Join Date: Mar 2009
Posts: 2
Hi! Mr. firenze

I am also encountering the same massages for my 23km river in hilly area.

" **** Matrix Solution Failed ****

Minimum error exceeds allowable tolerance at 01JAN2008 1200

River upper 154.*


Finished Unsteady Flow Simulation"

Can you please tell me how you overcome this error?
Can you guide me about the distance between two sections.

Thanks in advance
Reply With Quote