#1 (permalink)  
Old 03-08-2005, 04:18 PM
mbaetsch
Member
 
Posts: n/a
Dam break start time!

Dear Chris

If I have two dams in the same river and would like to simulate (Problem Specification 12), that the dam upstream is breaching before the dam downstream, where may I set the dam break time (start time!) for each dam.

Sincerely,

Michael Bätscher
Dipl. Bau-Ing. FH
HSR Hochschule Rapperswil
Abt. Bauingenieurwesen
Oberseestrasse 10
CH-8640 Rapperswil

Tel direkt: +41 55 222 49 77
Fax direkt: +41 55 222 42 66
e-mail: mbaetsch@hsr.ch
Internet: www.bau.hsr.ch <https://webmail.hsr.ch/exchweb/bin/redir.asp?URL=http://www.bau.hsr.ch/>
Reply With Quote
  #2 (permalink)  
Old 03-08-2005, 05:26 PM
Chris E. Maeder
Member
 
Posts: n/a
Re: Dam break start time!

Dear Michael Bätscher :

You need to route the model with out any dam failure by setting the value for "Water Surface Elevation at Time of Failure" in the Dam Description to a very high number. Then, observe the elevation of the water at each of the dam, and determine at what elevation the water is when you want the dam to fail. Then, change the value for "Water Surface Elevation at Time of Failure" to be the observed water surface elevation.

If you have any additional questions or need any further information, please contact me again.

Sincerely,

Chris E. Maeder, M.S., P.E.
Senior Technical Engineer
chris.maeder@bossintl.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 02:52 AM.