A new reservoir!

Dear Chris!

I have another problem with the model. I´m using option 14, so I can use the upstream area. I´m breaking the first dam and the dominoeffect breaks two downstream dams after that. But after these three dams the wave goes into a large reservoir and could break the fourth dam. The big problem is to acculy calculate this breaking because the program error in, sqrt.

I have two models with the same problem, so do I have to cut It in smaller sections?

Best Regards

Fredrik Persson
Reply With Quote
  #2 (permalink)  
Old 03-15-2005, 11:35 PM
Administrator
 
Join Date: Aug 2001
Location: Madison, WI
Posts: 780
Re: A new reservoir!

Fredrik :

Note that you can examine the maximum WSEL (water surface elevation) that is reached at the 4th dam. You can then decide to set the "Water Surface Elevation at Time of Failure" equal to or less than this maximum WSEL value. Then, re-run the DAMBRK model and it will then fail the 4th dam.

Sincerely,

Chris E. Maeder, M.S., P.E.
Senior Technical Engineer
chris.maeder@bossintl.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 02:40 AM.