#1 (permalink)  
Old 04-29-1999, 07:13 PM
Joe Kissel
Member
 
Posts: n/a
BOSS - Dambreak

Chris attached is a dambreak file.

The model is using Option 14. Dynamic routing downstream and level pool upstream of first dam. ( There are two dams, no bridges)

This model works. The results look acceptable.

I would like to see the reservoir depletion table.

I believe I have requested this table but can not locate.

Can you please look at this model. Why no reservoir depletion table?
Reply With Quote
  #2 (permalink)  
Old 04-29-1999, 07:29 PM
Chris E. Maeder
Member
 
Posts: n/a
Re: BOSS - Dambreak

Dear Joe Kissel :

Reservoir Depletion Tables are only available for Option 1. You will need to break your model into a single reservoir and then re-run the top most portion of your model as Option 1.

If you have any additional questions or need any further information, please contact me again.

Sincerely,

Chris E. Maeder, M.S.
Senior Technical Engineer
chris.maeder@bossintl.com
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 02:59 AM.