#1 (permalink)  
Old 04-23-2008, 06:17 AM
Registered User
 
Join Date: Apr 2008
Posts: 1
Flow Control from Resevoir

I am working project which design a water distribution systems by EPANET. I would like to ask how can I enforce a specific schedule of source flows into the network from my reservoirs with specific head.

I have tried to change the resevoir to node with negative demand with elevation equal to the total head of the resevoir. However, the head of node cannot maintained. Also, I have tried to install a FCV but it still not working.

Any Ideas of this cases.

Thank You
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 03:42 PM.