Urgent- Reservoir Emptying- Please Help

Hi all,
i am working on EPANET for first time. there are 5 nodes in m ysystem with a single reservoir with the head = 100m. The run is successfule but there is a warning message that reservoir emptiying after 5th run.

Also, there are negative flow velocities in the pipes.

Also the head at nodes are "UNTOLERABLY HIGH" IN THE UNITS OF 5*10^8 METERS.

are these things possible.

PLEASE HELP ME AS SOON AS POSSIBLE. i AM WORKING ON A PROJECT WHICH I NEED TO SUBMIT IN 4 DAYS
Reply With Quote
  #2 (permalink)  
Old 06-14-2008, 04:25 AM
Registered User
 
Join Date: Jun 2008
Posts: 3
no prob

negative velocities mean an opposing direction of flow from ur assumption while doing the model in epanet.exmple, u draw the pipe from left to right..epanet wil consider also left to right assumption of flow in that pipe ..however,upon running epanet will check flow..and give negative value of velocities for different flow direction.
with regards to ur emptying reservoir, try adding the head of the reservoir until it never empties.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 06:19 PM.