DDSWMM minimum major area

Is there a minimum area required for DDSWMM input files? I have a model
set up that returns the following error message:

*** ERROR *** Street Segment No. 723
No inflow into this segment from surface runoff or upstream
Check your input data....... EXECUTION IS TERMINATED

I have checked and rechecked the continuity of the input file and it is
correct. Street segment 723 has an area, albeit small, assigned as well
as 2 catch basins so in theory there should be surface runoff and inflow
to the minor system from this segment. If I remove this segment from
the input file I get the same error message for another segment and so
on. The segments that cause the errors all have small areas assigned (<
1Ha), so I think this may be the cause but I would like another opinion
before I start major modifications to the input file. I would
appreciate any comments or suggestions from anyone who has had this
problem or has a suggestion as to where I may have gone wrong.

Thanks,

George Blow, P.Eng.
george.blow@otttawa.ca
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 03:14 PM.