#1 (permalink)  
Old 09-07-2006, 10:34 PM
Registered User
 
Join Date: Sep 2006
Posts: 1
Detention Pond Drainage Simulation

I am trying to run simulation using EPA SWMM of the drainage of a detention pond. I am trying to simulate that the pond is already full and trying to determine how long it takes the pond to drain. I have the storage and rating curves defined, and I am successful in getting the simulation to run.

However, when I create a table of the volume in the storage unit, the volume steadily grows until it reaches its peak in about an hour and then begins to drain. I would like the volume to start at its peak and begin draining right away.

I would appreciate any suggestions that anyone has.

Thank you.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 05:32 PM.