Share/Save/Bookmark
Subscribe
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

  #1 (permalink)  
Old 04-02-2002, 05:34 PM
Registered User
 
Join Date: Dec 1969
Posts: 1
Reach with a Weir

It's possible to specify a discharge versus elevation rating curve (Rating Curve dialog box) in the same section where I previous declare an Uncontrolled Overflow Weir? I tried to do that because I want to fix the water surface elevation above the "Minimum Weir Flow Elevation" but I can't achieve a logical result. HEC-RAS computes an irrealist value to the water surface elevation in the downstream and upstream section of the weir (section 2 and 3).
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 06:49 AM.