#1 (permalink)  
Old 11-20-2003, 03:43 PM
Registered User
 
Join Date: Mar 2003
Posts: 11
Unsteady Hydrographs

When I'm creating an unsteady flow model and I'm importing my hydrographs from the DSS created by HEC1. My question is.....do I use the hydrographs from individual basins or should I use hydrographs that have been routed in HEC1. Any help is greatly appreciated.
Reply With Quote
  #2 (permalink)  
Old 11-20-2003, 03:44 PM
Registered User
 
Join Date: Jan 1970
Posts: 2
Re: Unsteady hydrographs

...backwater effects...
Reply With Quote
  #3 (permalink)  
Old 11-20-2003, 03:45 PM
Registered User
 
Join Date: Jan 1970
Posts: 0
Re: Unsteady hydrographs

This is typical behavior for a hydrograph resulting in a looped rating curve. See fig. 8.23 of the User's manual.

HEC-RAS Users Group wrote:

> Hi!
>
> Can anyone give me a reason why the resultant hydrograph of an unsteady flow simulation have a delay of one hour between the peak flow and peak stage, for the same RS??
>
> Gratefull.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 09:24 AM.