how to merge rivers?

Hello

I have got problems simplifying an existing Hec-Ras geometry.
For the sake of the example, say I have a geometry with two rivers: the river "main", which has two reaches called "upstream" and "downstream", and the river "tributary" which has a unique reach flowing into the river "main".

I want to simplify this geometry by removing one reach and the junction. Unfortunately the reach I want to remove is the reach "upstream" of the river "main". Therefore, if I want to remove the junction I have to merge two reaches belonging to two different rivers ("main - downstream" and "tributary").

I tried to do this by, first, deleting the "upstream" reach of the "main" river, and then deleting the junction. When I try to delete the junction (and therefore to merge the rivers), I get a message saying that stations downstream of the junction must be lower than stations upstream of the junction.

I thought that Hec-Ras would automatically accomodate for this and re-calculate the stations along the merged tributary, but this is not the case.

Could anybody help me?

Thanks a lot.

Arnaud
Reply With Quote
  #2 (permalink)  
Old 05-04-2008, 08:53 PM
Registered User
 
Join Date: Mar 2004
Posts: 179
From the geometry editor, select the Tables menu, select Names>River Stations. Select the reach in question and then highlight the entire column (click at the top, use cntrl + a, etc). Then add a constant so that the river stations downstream of the junction have a smaller river station than the ones upstream.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 10:56 PM.