|
Re: RMS and large drawing files
RMS did not lock up. I opened it here fine. However, ACAD has a limitation that makes it appear to lock up.
Load RMS first, then load the drawing file. Else, it will take about 20 minutes for ACAD to swap the RMS executable code with the drawing file. This is because any ADS applications must be loaded into contiguous memory after ACAD, and the drawing then loaded above these applications (this is a limitation with ACAD).
|